Neighborhood features
The amended declaration provides conditional owner/guest use of common recreational property and describes possible walking trails, boat ramps, community slips and piers. It expressly does not require the HOA to provide every listed facility. Confirm which facilities operate now and what access rights transfer with the lot.
Stoney Point Landing amended declaration · 165375 · Deeds Book 335, p. 283, article I and article II, §1The association's public page identifies Stoney Point Landing on Smith Lake near Double Springs and provides community management information.
Stoney Point Landing community page · Community Overview and management identification ↗
Building & ownership notes
The available document copies state:
The amended declaration requires at least 2,000 square feet of enclosed heated living area for homes fronting Smith Lake and 1,800 square feet otherwise. Basements, open porches, garages and other unheated space are excluded. New residential buildings and prior ARC review are required.
Stoney Point Landing amended declaration · 165375 · Deeds Book 335, p. 288, article V, §2(a)–(c); p. 291, §2(n)Improvements, exterior design/materials, landscaping and related work need ARC review. Submit complete construction/plot plans, exterior specifications and contractor insurance. The record includes a 45-day response/deemed-approval clause, followed by written permission to begin; obtain written authorization and the current ARC requirements.
Stoney Point Landing amended declaration · 165375 · Deeds Book 335, pp. 288–290, article V, §§1–2(l)A dwelling normally must be completed within one year after construction starts; specified physical-damage delays and written HOA/committee consent are exceptions. Outbuildings and other improvements normally have four months from construction commencement, with written-consent provisions.
Stoney Point Landing amended declaration · 165375 · Deeds Book 335, p. 291, article V, §2(o)Mobile/modular homes, trailers, campers and temporary/outbuilding structures may not be used as residences. Contractor shelters during main-home construction are the stated exception: committee approval must specify location and duration, and shelters must leave after construction finishes.
Stoney Point Landing amended declaration · 165375 · Deeds Book 335, p. 291, article V, §2(p)Annual assessments are fixed by the HOA board per lot and due January 31; special assessments are also provided for. Combined lots generally remain assessable per purchased lot, except the combinations expressly listed in the amended text. Current dollar amounts and balances are not established here.
Stoney Point Landing amended declaration · 165375 · Deeds Book 335, pp. 284–285, article II, §§2–5; p. 289, article V, §2(e)Clear-cutting is prohibited, specified larger live-tree removal needs approval, and road rights-of-way cannot hold signs, fences or parking. Boats/trailers over 28 feet, travel trailers and motor homes generally require prior committee approval unless kept in enclosed garages; smaller boats/trailers must be behind the building setback.
Stoney Point Landing amended declaration · 165375 · Deeds Book 335, pp. 289–290, article V, §2(g), (i); pp. 293–294, article VI, §2(d), (f)
Recorded document trail
Official record citations help identify the documents to review. Index entries alone do not establish their rules or current application to a lot. Use the county, instrument, book and page references to search and verify the records yourself.
The original association declaration and separate restrictions were recorded together in 2000. The amended declaration executed in 2018 and recorded in 2019 states that it supersedes the earlier restrictive covenants. Summaries use the amended provisions where the texts differ.
Stoney Point Landing original association declaration · 11572 · Deeds Book 237, pp. 150–158; 11573 · pp. 159–165; 165375 · Deeds Book 335, pp. 281–295 Stoney Point Landing original restrictive covenants · 11572 · Deeds Book 237, pp. 150–158; 11573 · pp. 159–165; 165375 · Deeds Book 335, pp. 281–295 Stoney Point Landing amended declaration · 11572 · Deeds Book 237, pp. 150–158; 11573 · pp. 159–165; 165375 · Deeds Book 335, pp. 281–295The 2001 supplement brings Phases IV, V and VI, Plat Book 3, pages 42–47, under the referenced declarations. The amended declaration also identifies earlier plat pages. These references do not replace checking the deed and recorded phase for the offered lot.
Stoney Point Landing Phase IV–VI supplement · 18144 · Deeds Book 240, pp. 763–764; 165375 · Deeds Book 335, pp. 281–282 Stoney Point Landing amended declaration · 18144 · Deeds Book 240, pp. 763–764; 165375 · Deeds Book 335, pp. 281–282The public association page lists later bylaws and ARC rules from 2022. Those substantive texts remain unreviewed; the 2018 amended declaration itself has now been read in its official recorded copy.
Stoney Point Landing community page · Public Documents list; 165375 · Deeds Book 335, pp. 281–295 ↗ Stoney Point Landing amended declaration · Public Documents list; 165375 · Deeds Book 335, pp. 281–295
Before you buy: a property checklist
- Which recorded phase, plat and later amendments govern this lot, and is it classified as fronting Smith Lake for the living-area minimum?
- What are the current dues per underlying lot, combined-lot exceptions, ARC fees, special assessments and unpaid balances?
- What do the current bylaws and ARC rules say about home materials, rental/guest use, plan approval, construction timing and RV/contractor shelters?
- What recorded common-access, dock or slip rights and shoreline permits transfer, and which recreational facilities operate now?
- Who maintains the roads, and what road charges, utility connections, well/septic approvals, tree-clearing or outbuilding conditions apply?